Khrunichev State Research and Production Space Center | Proton-M/Briz-M | ExoMars 2020 Kazachok surface platform & Rosalind Franklin rover

Khrunichev State Research and Production Space Center is scheduled to launch a Proton-M/Briz-M rocket as part of the ExoMars 2020 Surface Platform & Rosalind Franklin Rover mission. The launch window for the Robotic Exploration mission is on July 26, 2020 00:00:00 UTC from 200/39 (200L), Baikonur Cosmodrome, Kazakhstan. Don’t miss this exciting rocket launch! Watch the launch video of the Proton-M/Briz-M and experience the excitement for yourself.

View All Launch Details >

ExoMars 2020 Surface Platform & Rosalind Franklin Rover

ExoMars 2020 is a second mission of two-part astrobiology project to search for evidence of life on Mars, a joint mission of the European Space Agency and the Russian space agency Roscosmos that consists out of surface module with a rover onboard. The primary objective is to land the rover at a site with high potential for finding well-preserved organic material, particularly from the very early history of the planet. The rover is expected to travel several kilometers during its mission.

The European rover will be the first mission to combine the capability to move across the surface and to study Mars at depth. It will collect samples with a drill down to a depth of 2 m and analyze them with next-generation instruments in an onboard laboratory. Underground samples are more likely to include biomarkers, since the tenuous martian atmosphere offers little protection from radiation and photochemistry at the surface.

While the rover will drive away from the surface platform to perform scientific investigations within several kilometers of the landing site, the Russian-made platform will remain stationary and will investigate the local surface environment for its normal mission lifetime of one Earth year. The main science priorities for the platform are context imaging of the landing site, long-term climate monitoring, and atmospheric investigations. Sensors and instruments will also study the subsurface water distribution at the landing site, investigate the exchange of volatiles between the atmosphere and the surface, monitor the radiation environment and compare it with measurements made with the radiation dosimeter on the Trace Gas Orbiter, and carry out geophysical investigations of the planet’s internal structure.

Recent Posts

Russian Federal Space Agency (ROSCOSMOS) | Soyuz 2.1a | Soyuz MS-14 Uncrewed

Russian Federal Space Agency (ROSCOSMOS) is scheduled to launch a Soyuz 2.1a rocket as part of the Soyuz MS-14 Uncrewed… Read More

21 hours ago

United Launch Alliance | Delta IV M+(4,2) | GPS III SV02

United Launch Alliance is scheduled to launch a Delta IV M+(4,2) rocket as part of the GPS III SV02 "Magellan"… Read More

21 hours ago

ExPace | Kuaizhou-1A | Unknown

ExPace is scheduled to launch a Kuaizhou-1A rocket as part of the mission. The launch window for the mission is… Read More

21 hours ago

Russian Space Forces | Rokot / Briz-KM | Geo-IK-2 N13L

Russian Space Forces is scheduled to launch a Rokot / Briz-KM rocket as part of the Geo-IK-2 N13L mission. The… Read More

21 hours ago

ExPace | Kuaizhou-11 | Maiden Flight

ExPace is scheduled to launch a Kuaizhou-11 rocket as part of the Maiden Flight mission. The launch window for the… Read More

21 hours ago

China Aerospace Science and Technology Corporation | Long March 11 | Zhuhai-1-03

China Aerospace Science and Technology Corporation is scheduled to launch a Long March 11 rocket as part of the mission.… Read More

21 hours ago